Antakya Historic City Center · 19 December 2025

Kurtuluş Avenue & Uzun Çarşı latest status 360°

Antakya's centuries-old trade axis is rising again. We recorded the construction site's state on 19 December 2025 from the air, in 360° from 11 points. Tour the avenue line, the building blocks and the point the work has reached on a single screen.

Drag to look around · Use the arrows or the thumbnails below to move on
Project
Antakya Historic City Center · TOKİ
Location
Kurtuluş Avenue and Uzun Çarşı, Antakya
Shoot date
19 December 2025
Scope
11 scenes · Aerial 360° · Construction documentation

About the project

Kurtuluş Avenue and Uzun Çarşı are the backbone of Antakya's historic urban fabric and commercial life. Within the Antakya Historic City Center works, this axis is being rebuilt from end to end today.

Describing progress over such a wide area with ground photographs is not possible. That is why we documented the site from the air with 360° panoramas from 11 selected points along the avenue line. Each scene preserves the point the work had reached as of 19 December 2025 as a dated, permanent record.

What's in the tour?

  1. 01

    Kurtuluş Avenue line

    Aerial panoramas moving along the avenue; the road route is marked on the tour.

  2. 02

    Uzun Çarşı and building blocks

    The roofs, scaffolding and rough construction state of the buildings around the bazaar, at a glance from above.

  3. 03

    Landmark points

    Places in the city's memory, such as Affan Kahvesi, are labeled; tour without losing track of where you are.

  4. 04

    Site logistics

    Material areas, machinery and work zones — the whole site without being on site.

Why is construction documentation important?

  • Date-stamped evidence. Each shoot shows indisputably where the work stood that day; it is a strong basis for progress payments and reporting.
  • Progress side by side. With periodic shoots from the same points, change over months can be compared.
  • Remote inspection. Institutions, consultants and contractors decide on the same imagery without going to the site.

Frequently asked questions

How often is a construction documentation tour shot?

A weekly, biweekly or monthly interval is set according to the project's pace. Each shoot is made from the same points and added to the archive with a date stamp, so progress can be compared side by side.

What does an aerial 360° shoot show?

The whole that cannot be seen from the ground: the positions of building blocks, roads and machinery, and which area the work has reached and at what stage, in a single panorama.

Can I have 360° documentation made for my own construction site?

Yes. Antakya360 shoots periodic 360° on the ground and from the air for residential, infrastructure, restoration and urban regeneration sites, and gathers the tours under a single shareable link.

Put your construction site
360° on record, too.

Residential, infrastructure or urban regeneration — the first survey visit is free.